Basis Property GroupFull component index ↗

Inside a community bank branch

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Ashmere BranchThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical community bank branch. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Ashmere Branch: every component and its recovery period

The bank owns fixed teller glazing and cash-safe infrastructure in the illustrative purchase. This class treatment is an engineering assumption, not a conclusion about every bank. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year5$480,000yes
15-year5$360,000yes
39-year (building)7$1,995,000no
Total allocated to depreciable property17$2,835,000

Component by component

ComponentRecovery periodIllustrative amount
Cash teller fixturesThe detached cash drawers and teller stations serve banking in this example.5-year$220,000
Vault assemblyThe modular security vault serves the bank operation in this example.5-year$155,000
Lobby furnishingsMovable furniture serves the customer lobby in this example.5-year$45,000
ATM vestibuleDedicated ATM equipment serves transactions in this example.5-year$30,000
Office partitions and desksMovable office property serves employees in this example.5-year$30,000
Teller lanesThe detached drive-through paving and canopies serve the site in this example.15-year$210,000
Customer lotPrivate parking serves the branch in this example.15-year$90,000
Entry pathsDetached walkways serve the parcel in this example.15-year$24,000
Lot lightingThe exterior poles illuminate the lot in this example.15-year$18,000
Planted islandsPermanent island landscaping is a site improvement in this example.15-year$18,000
Roof assemblyThe roof protects the building and follows the 39-year schedule in this example.39-year$588,000
Brick branch enclosureThe permanent walls enclose the property in this example.39-year$420,000
Branch comfort systemGeneral conditioning serves the whole branch in this example.39-year$300,000
Lobby storefrontThe glazing is part of the building enclosure in this example.39-year$250,000
Branch utilitiesGeneral infrastructure supports occupancy in this example.39-year$205,000
FoundationThe slab supports the branch in this example.39-year$150,000
Bonded branch flooringBonded flooring remains with the building in this example.39-year$82,000