Basis Property GroupFull component index ↗

Inside a bowling alley

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Pinstrike LanesThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical bowling alley. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Pinstrike Lanes: every component and its recovery period

The property is fictional. Class shares and building life follow the controlling queue row and are illustrative only. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year2$1,800,000yes
15-year5$1,800,000yes
39-year (building)9$11,400,000no
Total allocated to depreciable property16$15,000,000

Component by component

ComponentRecovery periodIllustrative amount
Bowling equipmentMovable scoring and pin equipment supports bowling. in this example.5-year$1,300,000
Lane furnishingsMovable seating and counter furnishings serve bowlers. in this example.5-year$500,000
Customer parkingDetached parking serves customers and staff. in this example.15-year$1,000,000
Lot access pavingDetached access paving serves the parcel. in this example.15-year$350,000
Entry walksDetached paths connect the bowling alley and lot. in this example.15-year$200,000
Lot lightingDetached poles illuminate the parcel. in this example.15-year$150,000
Landscape islandsPlanted islands improve the parcel. in this example.15-year$100,000
Bowling alley enclosurePermanent walls enclose the bowling facility. in this example.39-year$3,800,000
Roof assemblyThe roof protects the building. in this example.39-year$1,700,000
Foundation and slabThe foundation supports the building. in this example.39-year$1,500,000
Comfort systemsGeneral heating and cooling serve the building. in this example.39-year$1,000,000
Lane and service partitionsPermanent partitions form lanes and service rooms. in this example.39-year$900,000
Electrical distributionGeneral electrical infrastructure serves the building. in this example.39-year$900,000
Permanent flooring and lanesPermanent flooring and lane surfaces remain with the building. in this example.39-year$800,000
Lobby glazingGlazing forms the entry envelope. in this example.39-year$400,000
General plumbingGeneral plumbing serves occupancy. in this example.39-year$400,000

Sources