Inside a car wash

See what gets built, what gets installed, and how a study classifies each asset.

Preparing your car washThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical car wash. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

This is an illustrative $3.2 million express car wash, not a study of any real property. Change the numbers to explore proportional allocations; a study determines actual asset costs.

Full example assumptions and allocation table

See the rendered stills
Roof-free view of the conveyor, presoak arches, wash brushes, rinse arches and dryer array inside the glazed tunnel.
Inside the 120-foot wash tunnel
Overhead view showing two entry pay lanes, the long wash tunnel, rear circulation and ten shaded vacuum parking spaces.
The queue, wash and vacuum flow

Blender renders of the same model the walkthrough uses.

Rinsecrest: every component and its recovery period

Rinsecrest is a fictional owner-operated express car wash with $3,200,000 total investment and $700,000 of nondepreciable land. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative assumption. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year10$1,105,000yes
15-year11$1,395,000yes
Total allocated to depreciable property21$2,500,000

Component by component

ComponentRecovery periodIllustrative amount
Wash piping and controlsDedicated wash-water piping, motor controls and equipment circuits use the 5-year equipment schedule in this example.5-year$180,000
Wash brushesThe rotating side brushes and overhead wash mitter are 5-year service equipment in this example.5-year$170,000
Water reclaim systemThe wash-water recovery tanks, filters and pumps are 5-year service equipment in this example.5-year$145,000
Conveyor and guide railsThe vehicle conveyor and its dedicated drive are 5-year service equipment in this example.5-year$135,000
DryersThe blower array and air nozzles are 5-year wash equipment in this example.5-year$110,000
Vacuum stationsThe vacuum producers, hoses and cleaning stations are 5-year service equipment in this example.5-year$110,000
Presoak and entry equipmentThe presoak applicators, entry sensors and dedicated controls are 5-year wash equipment in this example.5-year$85,000
Pay stations and gatesThe payment kiosks, readers and vehicle-control gates are 5-year service equipment in this example.5-year$70,000
Rinse and finish archesThe rinse, protective-finish and final-rinse applicators are 5-year wash equipment in this example.5-year$65,000
Illuminated sign face5-year$35,000
Glazed wash tunnelThe wash tunnel walls, shared staff-room wall and structural frame use the 15-year car-wash-building schedule in this example.15-year$390,000
Queue and vacuum pavingThe queue lanes and vacuum parking surfaces use the 15-year land-improvement schedule in this example.15-year$320,000
Wash building roof15-year$175,000
Vacuum shade canopiesThe permanent steel shade structures and foundations are conservatively treated as 15-year land improvements in this example.15-year$149,000
Tunnel floor and foundationThe tunnel floor and foundation use the 15-year car-wash-building schedule in this example.15-year$90,000
Attached staff roomThe staff room and restroom share the wash building wall and roof and use its 15-year schedule in this example.15-year$86,000
Curbs and site drainageThe curbs, surface drains and site stormwater system are 15-year land improvements in this example.15-year$60,000
Rear perimeter wallThe freestanding rear masonry boundary wall is a 15-year land improvement in this example.15-year$45,000
California planting bedsThe installed planting beds and irrigation are 15-year land improvements in this example.15-year$35,000
Site lightsThe pole lights and dedicated site-lighting circuits are 15-year land improvements in this example.15-year$30,000
Roadside sign pylonThe permanent roadside pylon and concrete footing are 15-year land improvements in this example.15-year$15,000