Inside a data center

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Frostvale Data HallThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical data center. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Frostvale Data Hall: every component and its recovery period

The property is fictional. Class shares and building life follow the controlling queue row and are illustrative only. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year3$3,300,000yes
15-year6$1,800,000yes
39-year (building)9$9,900,000no
Total allocated to depreciable property18$15,000,000

Component by component

ComponentRecovery periodIllustrative amount
Server racksMovable server racks support data operations. in this example.5-year$2,100,000
Backup generatorsMovable backup generator units support continuity. in this example.5-year$800,000
UPS equipmentMovable power protection equipment supports data operations. in this example.5-year$400,000
Perimeter fence and gateDetached security fencing controls access to the parcel. in this example.15-year$600,000
Generator yard pavingDetached paving serves the backup generator yard. in this example.15-year$500,000
Staff parkingA small detached lot serves staff and service vehicles. in this example.15-year$300,000
Security lightingDetached poles illuminate the secured parcel. in this example.15-year$180,000
Screen plantingScreen planting improves the perimeter. in this example.15-year$120,000
Secure access walksDetached walks connect the service entry. in this example.15-year$100,000
Secure windowless enclosurePermanent walls enclose the secure data hall. in this example.39-year$3,600,000
Foundation and slabThe foundation supports the building. in this example.39-year$1,400,000
Data hall cooling systemsPermanent cooling systems serve the data hall. in this example.39-year$1,200,000
Roof assemblyThe roof protects the building. in this example.39-year$1,100,000
Raised data floorPermanent raised floors support building operations. in this example.39-year$900,000
Main electrical systemGeneral electrical infrastructure serves the building. in this example.39-year$600,000
Service room partitionsPermanent partitions form service rooms. in this example.39-year$400,000
Building security systemsPermanent security infrastructure serves the facility. in this example.39-year$400,000
General plumbingGeneral plumbing serves the facility. in this example.39-year$300,000