Basis Property GroupFull component index ↗

Inside a fitness center

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Wellstead FitnessThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical fitness center. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Wellstead Fitness: every component and its recovery period

The property is fictional. Class shares and the building life follow the controlling queue row and are illustrative only. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year4$1,350,000yes
15-year5$1,800,000yes
39-year (building)9$11,850,000no
Total allocated to depreciable property18$15,000,000

Component by component

ComponentRecovery periodIllustrative amount
Cardio equipmentMovable cardio machines serve the fitness operation. in this example.5-year$500,000
Weight equipmentMovable strength equipment serves the fitness operation. in this example.5-year$450,000
Locker room furnishingsMovable furnishings support member use. in this example.5-year$250,000
Studio audio visualMovable audio visual equipment serves classes. in this example.5-year$150,000
Member parkingDetached parking serves members and staff. in this example.15-year$850,000
Outdoor courtThe detached recreation court improves the site. in this example.15-year$400,000
Entry walksDetached walks connect the entries. in this example.15-year$300,000
Site lightingDetached poles illuminate the site. in this example.15-year$150,000
Landscape islandsPlanted beds improve the parcel. in this example.15-year$100,000
Fitness center enclosurePermanent walls enclose the fitness center. in this example.39-year$3,500,000
Roof assemblyThe roof protects the building. in this example.39-year$2,000,000
Foundation and slabThe foundation supports the building. in this example.39-year$1,200,000
Comfort systemsGeneral heating and cooling serve the building. in this example.39-year$1,000,000
Permanent flooringBonded flooring remains with the building. in this example.39-year$1,000,000
Studio partitionsPermanent partitions form studio spaces. in this example.39-year$950,000
Electrical distributionGeneral electrical infrastructure serves the building. in this example.39-year$900,000
Lobby glazingGlazing forms the building envelope. in this example.39-year$800,000
General plumbingGeneral plumbing serves occupancy. in this example.39-year$500,000

Sources