Inside a funeral home
See what gets built, what gets installed, and how a study classifies each asset.
That was a hypothetical funeral home. Yours has its own purchase price and land split.
See the first-year deduction range a study would look for on your building.
Run the 30-second check »Take a closer look
Click a fixture to identify it. Drag to orbit. Choose from the list to focus on a component.
Edit the dollar example & see the assumptions
Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.
See the rendered stills
Blender renders of the same model the walkthrough uses.
Hearthmere Chapel: every component and its recovery period
The property is fictional. Class shares and building life follow the controlling queue row and are illustrative only. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.
illustrative scenario. A real study's allocation comes from the specific property's own records.
By recovery period
| Recovery period | Components | Illustrative amount | Bonus-eligible here |
|---|---|---|---|
| 5-year | 4 | $1,650,000 | yes |
| 15-year | 6 | $1,800,000 | yes |
| 39-year (building) | 9 | $11,550,000 | no |
| Total allocated to depreciable property | 19 | $15,000,000 |
Component by component
| Component | Recovery period | Illustrative amount |
|---|---|---|
| Chapel furnishingsMovable seating and furnishings serve the chapel. in this example. | 5-year | $500,000 |
| Service equipmentMovable service equipment supports the facility. in this example. | 5-year | $500,000 |
| Audio visual equipmentMovable audio visual equipment supports services. in this example. | 5-year | $350,000 |
| Viewing furnishingsMovable furnishings serve the viewing rooms. in this example. | 5-year | $300,000 |
| Visitor parkingDetached parking serves visitors and staff. in this example. | 15-year | $750,000 |
| Family car laneDetached paving routes family vehicles to the covered entry. in this example. | 15-year | $450,000 |
| Entry monument signThe detached sign identifies the property. in this example. | 15-year | $180,000 |
| Entry walksDetached paths connect the chapel and viewing rooms. in this example. | 15-year | $150,000 |
| Site lightingDetached poles illuminate the parcel. in this example. | 15-year | $150,000 |
| Quiet gardensPlanted beds improve the parcel. in this example. | 15-year | $120,000 |
| Chapel and viewing enclosurePermanent walls enclose the chapel and viewing rooms. in this example. | 39-year | $3,500,000 |
| Roof assemblyThe roof protects the building. in this example. | 39-year | $2,500,000 |
| Foundation and slabThe foundation supports the building. in this example. | 39-year | $1,200,000 |
| Electrical distributionGeneral electrical infrastructure serves the building. in this example. | 39-year | $900,000 |
| Comfort systemsGeneral heating and cooling serve the building. in this example. | 39-year | $900,000 |
| Interior partitionsPermanent partitions form chapel and viewing rooms. in this example. | 39-year | $750,000 |
| Permanent flooringBonded flooring remains with the building. in this example. | 39-year | $650,000 |
| Entry and viewing glazingGlazing forms the building envelope. in this example. | 39-year | $600,000 |
| General plumbingGeneral plumbing serves occupancy. in this example. | 39-year | $550,000 |