Basis Property GroupFull component index ↗

Inside a light industrial manufacturing facility

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Haverstock WorksThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical light industrial manufacturing facility. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Haverstock Works: every component and its recovery period

The property is fictional. Class shares and building life follow the controlling queue row and are illustrative only. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year2$450,000yes
7-year1$1,800,000yes
15-year5$1,950,000yes
39-year (building)9$10,800,000no
Total allocated to depreciable property17$15,000,000

Component by component

ComponentRecovery periodIllustrative amount
Inspection equipmentPortable inspection equipment supports production. in this example.5-year$250,000
Operator stationsMovable operator stations support production. in this example.5-year$200,000
Process machineryProduction line machinery follows its illustrative equipment class. in this example.7-year$1,800,000
Truck courtPaving serves the loading yard. in this example.15-year$900,000
Service walksDetached walkways connect site entries. in this example.15-year$500,000
Dock levelersDock levelers serve loading operations. in this example.15-year$300,000
Site lightingDetached poles illuminate the site. in this example.15-year$150,000
Landscape bufferPlanted beds improve the parcel. in this example.15-year$100,000
Production hall enclosurePermanent walls enclose the production hall. in this example.39-year$3,600,000
Roof assemblyThe roof protects the building. in this example.39-year$2,450,000
Foundation and slabThe foundation supports the building. in this example.39-year$1,200,000
General electricalGeneral electrical infrastructure serves the building. in this example.39-year$950,000
Comfort systemsGeneral heating and cooling serve the building. in this example.39-year$800,000
General plumbingGeneral plumbing serves occupancy. in this example.39-year$500,000
Permanent flooringBonded floors remain with the building. in this example.39-year$500,000
Clerestory glazingThe glazing forms the building envelope. in this example.39-year$450,000
Office partitionsPermanent partitions form the office area. in this example.39-year$350,000

Sources