Inside a multiplex movie theater

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Starfall CinemaThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical multiplex movie theater. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Starfall Cinema: every component and its recovery period

The property is fictional. Class shares and building life follow the controlling queue row and are illustrative only. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year4$2,250,000yes
15-year5$2,250,000yes
39-year (building)9$10,500,000no
Total allocated to depreciable property18$15,000,000

Component by component

ComponentRecovery periodIllustrative amount
Projection equipmentMovable projection equipment serves screenings. in this example.5-year$1,000,000
Auditorium seatingMovable seating equips the auditoriums. in this example.5-year$650,000
Sound equipmentMovable sound equipment serves screenings. in this example.5-year$300,000
Concession equipmentMovable concession equipment serves the lobby. in this example.5-year$300,000
Shared parking fieldDetached parking serves the theater and pad site. in this example.15-year$1,400,000
Shared access driveDetached access paving serves the shared lot. in this example.15-year$300,000
Lot lightingDetached poles illuminate the shared lot. in this example.15-year$250,000
Entry walksDetached paths connect the lobby and lot. in this example.15-year$150,000
Landscape islandsPlanted islands improve the parcel. in this example.15-year$150,000
Auditorium and lobby wallsPermanent walls enclose the auditoriums and lobby. in this example.39-year$3,000,000
Comfort systemsGeneral heating and cooling serve the building. in this example.39-year$1,500,000
Foundation and slabThe foundation supports the building. in this example.39-year$1,200,000
Auditorium partitionsPermanent partitions separate auditoriums. in this example.39-year$1,100,000
Electrical distributionGeneral electrical infrastructure serves the building. in this example.39-year$1,100,000
Roof assemblyThe roof protects the building. in this example.39-year$1,000,000
Permanent flooringBonded flooring remains with the building. in this example.39-year$700,000
Lobby glazingGlazing forms the lobby envelope. in this example.39-year$500,000
General plumbingGeneral plumbing serves occupancy. in this example.39-year$400,000