Basis Property GroupFull component index ↗

Inside an RV park

See what gets built, what gets installed, and how a study classifies each asset.

Preparing your RV parkThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical RV park. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

This is an illustrative $2.4 million, 18-site RV park with three rental cabins, not a study of any real property. Change the numbers to explore proportional allocations; a study determines actual asset costs.

Full example assumptions and allocation table

See the rendered stills
A roof-open rental cabin with two separate bedrooms, a full bathroom and an open kitchen and living room.
A complete two-bedroom rental cabin
The opened service building shows reception, individual shower and toilet rooms, and a separate guest laundry room.
Bathhouse, office and guest laundry
A large unbranded gray and green vending kiosk with separate ice and water dispensing areas beside the arrival court.
The ice and water station
Overhead view of eighteen RV pads around a one-way loop, three rental cabins in their own row, and the front service court.
RV loop and separate rental cabins

Blender renders of the same model the walkthrough uses.

Fenlark Camp: every component and its recovery period

The fictional park operates 18 transient RV sites and three permanently founded, owner-owned rental cabins, all for business use. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year5$133,000yes
7-year1$14,000yes
15-year12$973,000yes
39-year (building)10$580,000no
Total allocated to depreciable property28$1,700,000

Component by component

ComponentRecovery periodIllustrative amount
Ice and water vendingThe integrated retail ice and water vending machine is removable 5-year equipment in this example.5-year$45,000
Cabin beds and seatingThe removable guest beds, sofas, tables and storage use the 5-year lodging-furniture class in this example.5-year$36,000
Guest laundry equipmentThe removable coin-operated washers and dryers use the 5-year service-equipment class in this example.5-year$22,000
Cabin kitchen appliancesThe removable kitchen appliances are assumed to use the 5-year equipment class in this example.5-year$18,000
Booking computer and paymentThe administrative computer and point-of-sale equipment use their 5-year classes in this example.5-year$12,000
Office desk and seatingThe administrative desk and chairs are assumed to use the 7-year office-furniture class in this example.7-year$14,000
Loop road and entry parkingThe internal loop road, arrival court and related grading use the 15-year schedule in this example.15-year$220,000
RV pads and cabin parkingThe individual RV pads and detached cabin parking are assumed to use the 15-year land-improvement schedule in this example.15-year$160,000
Campsite sewer hookupsThe owner-owned RV sewer connections and dump station are assumed to use the independent 15-year land-improvement schedule in this example.15-year$125,000
Campsite power pedestalsThe owner-owned electrical network supplies the RV pads rather than the buildings and is assumed to use the 15-year land-improvement schedule in this example.15-year$120,000
Campsite water hookupsThe owner-owned water lines serve the RV pads separately from the buildings and are assumed to use the 15-year land-improvement schedule in this example.15-year$105,000
Stormwater and swalesThe independent runoff swales, culverts and catch basins use the 15-year schedule in this example.15-year$70,000
Landscape beds and plantingThe installed planting beds and replaceable site landscaping use the 15-year schedule in this example.15-year$40,000
Retaining wallsThe detached site retaining walls use the 15-year land-improvement schedule in this example.15-year$35,000
Site fencing and gatesThe permanent site fences and controlled entry gate use the 15-year land-improvement schedule in this example.15-year$30,000
Picnic court and fire ringsThe detached surfaced picnic court and permanent ground-set fire rings use the 15-year schedule in this example.15-year$25,000
Site lights and camp signThe freestanding site lights and permanent ground-mounted entry sign use 15 years in this example.15-year$25,000
Anchored picnic tablesThe permanent timber picnic tables on embedded concrete bases are land improvements on 15 years in this example.15-year$18,000
Cabin walls and windowsThe permanent cabin walls, doors, windows and room partitions are assumed to use 39 years in this example.39-year$170,000
Bathhouse and office wallsThe service building walls, windows, doors and fixed reception counter are assumed to be part of the 39-year building in this example.39-year$120,000
Bathhouse plumbing fixturesThe fixed toilets, showers, sinks and general building water and waste connections are assumed to use 39 years in this example.39-year$55,000
Cabin floors and porchesThe permanent cabin foundations, floors and attached porches are assumed to be part of the 39-year lodging buildings in this example.39-year$55,000
Cabin bathroomsThe fixed cabin bathrooms, vanities and general plumbing are assumed to be part of the 39-year lodging buildings in this example.39-year$45,000
Bathhouse slab and floorsThe permanent bathhouse foundation, floors and tile are assumed to be part of the 39-year building in this example.39-year$35,000
Cabin and bathhouse roofsThe cabin and bathhouse roofs and high eave trim are assumed to be part of the 39-year buildings in this example.39-year$35,000
Cabin cabinets and countersThe built-in cabin kitchen cabinets and counters are assumed to be part of the 39-year buildings in this example.39-year$25,000
Building power and lightingThe ordinary building electrical supply, fixed lighting and protection alarms are assumed to use 39 years in this example.39-year$20,000
Building comfort HVACThe permanently installed comfort heating, cooling and ventilation are assumed to use 39 years in this example.39-year$20,000

Sources