Basis Property GroupFull component index ↗

Inside a strip mall

See what gets built, what gets installed, and how a study classifies each asset.

Preparing your strip mallThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical strip mall. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

This is an illustrative $3.4 million, ten-bay strip mall, not a study of any real property. Change the numbers to explore proportional allocations; a study determines actual asset costs.

Full example assumptions and allocation table

See the rendered stills
Tan brick and EIFS storefronts on a stone base with two corner towers, green fabric awnings and generic wall signs reading COFFEE, NAILS, PIZZA and TAX SERVICE.
The front of the center
A roof-open view of the inline suites: the vacant bay with its bare landlord shell and FOR LEASE sign beside the tax service and tutoring suites, whose removable carpet the landlord owns.
The suites with the roof open
The back of the building with a steel service door for each bay, the meter bank, rooftop units over the parapet and the masonry dumpster enclosure.
The rear service side
An overhead plan of the 240 by 65 foot building, the 62-stall lot with three accessible stalls, the pylon sign at the road and the drive-thru lane on the east end cap.
The lot, pylon sign and coffee drive-thru

Blender renders of the same model the walkthrough uses.

Pellbrook Crossing: every component and its recovery period

The fictional center leases ten shop bays, eight inline and two end caps, to retail and service tenants. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

illustrative scenario. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year3$62,000yes
15-year7$426,000yes
39-year (building)12$2,262,000no
Total allocated to depreciable property22$2,750,000

Component by component

ComponentRecovery periodIllustrative amount
Fabric storefront awningsThe bolted fabric awnings are treated as readily removable coverings and assumed to be 5-year retail property in this example.5-year$32,000
Removable suite carpetThe removable carpet in the two second-generation suites the landlord owns is assumed to be 5-year property under the retail class in this example.5-year$16,000
Pylon sign facesThe lit faces the landlord owns on the pylon are assumed to be 5-year retail property in this example.5-year$14,000
Parking lot and stripingThe paving, striping, accessible stalls and bumper blocks are 15-year land improvements in this example.15-year$210,000
Detention basin and drainsThe independent detention basin, catch basins and site drainage are 15-year land improvements in this example.15-year$60,000
Curbs and front sidewalkThe site curbs and the front sidewalk are 15-year land improvements in this example.15-year$45,000
Landscape islands and bedsThe planted islands, beds and irrigation are 15-year land improvements in this example.15-year$35,000
Parking light polesThe independent parking light poles and their footings are 15-year land improvements in this example.15-year$30,000
Pylon sign structureThe pylon's poles, footings and cabinet are 15-year land improvements in this example.15-year$28,000
Dumpster enclosureThe freestanding masonry dumpster enclosure is not attached to the building and is a 15-year land improvement in this example.15-year$18,000
Brick, stone and EIFS wallsThe masonry walls, stone base and EIFS facade are assumed to use the 39-year building schedule in this example.39-year$420,000
Roof deck and membraneThe roof deck, membrane, parapet caps and drains are assumed to use the 39-year building schedule in this example.39-year$307,000
Foundations and slabThe concrete foundations and slab on grade remain with the 39-year building in this example.39-year$300,000
Steel frame and roof joistsThe structural steel columns, beams and roof joists remain with the 39-year building in this example.39-year$230,000
Storefront glass and doorsThe aluminum storefront glass, entry doors and transoms follow the 39-year building schedule in this example.39-year$210,000
Rooftop heating and coolingThe rooftop units and curbs provide comfort heating and cooling and remain with the 39-year building in this example.39-year$170,000
Power, meters and lightingThe service, tenant meter bank, panels, general lighting and wall packs are assumed to use the 39-year building schedule in this example.39-year$160,000
Corner towers and arcadesThe corner towers and the covered arcades framed into them are part of the building shell and use the 39-year schedule in this example.39-year$120,000
Demising walls and ceilingsThe deck-to-deck walls between tenants and the suite ceilings remain with the 39-year building in this example.39-year$110,000
Suite restrooms and plumbingThe restroom fixtures and ordinary domestic plumbing, the rear grease interceptor included, remain with the 39-year building in this example.39-year$95,000
Sprinklers and fire riserThe ordinary sprinkler network, fire riser and connection are assumed to use the 39-year building schedule in this example.39-year$85,000
Water, sewer and gas linesThe water, sewer and gas lines from the street to the building are assumed to use the 39-year building schedule in this example.39-year$55,000

Sources