Inside a dental office
See what gets built, what gets installed, and how a study classifies each asset.
That was a hypothetical dental office. Yours has its own purchase price and land split.
See the first-year deduction range a study would look for on your building.
Run the 30-second check »Take a closer look
Click a fixture to identify it. Drag to orbit. Choose from the list to focus on a component.
Edit the dollar example & see the assumptions
This is an illustrative $2.4 million, 6,000-square-foot owner-occupied dental office, not a study of any real property. Change the numbers to explore proportional allocations; a study determines actual asset costs.
See the rendered stills




Blender renders of the same model the walkthrough uses.
Alderwell Dental: every component and its recovery period
Fictional building acquisition for $2,400,000 including $400,000 nondepreciable land; these allocations are authored educational assumptions, not an appraisal, engineering study or construction bid. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.
Authored educational assumptions; not a valuation or tax conclusion. A real study's allocation comes from the specific property's own records.
By recovery period
| Recovery period | Components | Illustrative amount | Bonus-eligible here |
|---|---|---|---|
| 5-year | 5 | $380,000 | yes |
| 15-year | 5 | $250,000 | yes |
| 39-year (building) | 13 | $1,370,000 | no |
| Total allocated to depreciable property | 23 | $2,000,000 |
Component by component
| Component | Recovery period | Illustrative amount |
|---|---|---|
| Operatory cabinetryRemovable dental-specific cabinet modules support clinical work rather than general building use and receive 5-year treatment in this example. | 5-year | $125,000 |
| Dental equipment plumbingDedicated vacuum, compressed-air and equipment water branches serve dental equipment only and use 5 years in this example. | 5-year | $95,000 |
| Dental equipment circuitsTraceable equipment-only electrical branches are allocated to 5-year dental use in this example. | 5-year | $90,000 |
| Sterilization cabinetryRemovable procedure-specific instrument-processing cabinet modules receive 5-year treatment in this example. | 5-year | $45,000 |
| Removable carpet tilesReplaceable carpet tiles are separate floor coverings on the 5-year schedule in this example. | 5-year | $25,000 |
| Parking and stripingPaving, curbs and striping serve the site rather than the building and use 15 years in this example. | 15-year | $150,000 |
| Sidewalks and entry walkDetached site walks are 15-year land improvements in this example. | 15-year | $30,000 |
| Planting and irrigationInstalled planting beds, shrubs and irrigation are 15-year land improvements in this example. | 15-year | $25,000 |
| Parking and path lightsFreestanding parking and path lighting serve the site and use 15 years in this example. | 15-year | $25,000 |
| Monument signThe fixed freestanding monument and sign structure receive conservative 15-year site treatment in this example. | 15-year | $20,000 |
| Masonry and framingExterior walls and structural framing are permanent building components on 39 years in this example. | 39-year | $450,000 |
| Concrete foundationThe slab and footings support the building and remain on the 39-year schedule in this example. | 39-year | $140,000 |
| Windows and entry doorsPermanent glazing and building entry doors follow the 39-year building schedule in this example. | 39-year | $110,000 |
| Heating and coolingComfort heating and cooling serve the whole building and remain on 39 years in this example. | 39-year | $110,000 |
| Room walls and doorsFixed partitions and doors divide occupied rooms and remain on 39 years in this example. | 39-year | $100,000 |
| Building electricalGeneral lighting, receptacles and their building-serving distribution remain on 39 years in this example. | 39-year | $95,000 |
| Building plumbingDomestic water, sanitary drainage and general-use plumbing remain on 39 years in this example. | 39-year | $75,000 |
| Roof and rainwaterThe membrane roof, clerestory and parapets remain on the 39-year building schedule in this example. | 39-year | $75,000 |
| Tile and permanent floorsPermanent tile and adhered resilient floors remain with the building on 39 years in this example. | 39-year | $60,000 |
| Reception counterPermanently built-in reception counters and cabinetry receive conservative 39-year treatment in this example. | 39-year | $45,000 |
| Restrooms and fixturesToilets, lavatories and fixed restroom finishes remain on the 39-year building schedule in this example. | 39-year | $45,000 |
| Imaging room shieldingPermanent lead-lined partitions and shielding receive conservative 39-year building treatment in this example. | 39-year | $35,000 |
| Staff room cabinetryBuilt-in staff kitchen cabinets and sinks serve general occupancy and remain on 39 years in this example. | 39-year | $30,000 |