Basis Property GroupFull component index ↗

Inside a fourth-floor office condo

See what gets built, what gets installed, and how a study classifies each asset.

Preparing Rillstone ChambersThe complete model loads before the walkthrough begins.
0:00 / 1:34
Empty siteBuild & classifyYear-one totals
Preparing the model and materials…

That was a hypothetical fourth-floor office condo. Yours has its own purchase price and land split.

See the first-year deduction range a study would look for on your building.

Run the 30-second check »
Edit the dollar example & see the assumptions

Edit the acquisition and land values to see how the illustrative component costs and federal deductions change.

Full example assumptions and allocation table

See the rendered stills

Blender renders of the same model the walkthrough uses.

Rillstone Chambers: every component and its recovery period

The acquisition is one existing office condominium. One-sixth of the specified shared land, paving, walks, core and roof is included. Adjacent offices and upper and lower floors are context. The tables below list every component this walkthrough builds, the recovery period it is assigned in this illustration, and its illustrative allocation.

Provisional owned-condominium scenario; authored educational allocation. A real study's allocation comes from the specific property's own records.

By recovery period

Recovery periodComponentsIllustrative amountBonus-eligible here
5-year2$176,000yes
15-year2$80,000yes
39-year (building)12$1,344,000no
Total allocated to depreciable property16$1,600,000

Component by component

ComponentRecovery periodIllustrative amount
Removable suite carpetLoose-lay carpet tiles can be lifted and replaced and use the 5-year schedule in this example.5-year$112,000
Data equipment and cablingRemovable network assets and dedicated cabling serve the suite equipment and use the 5-year schedule in this example.5-year$64,000
Shared parking interestThe allocated surface parking and striping serve the common site and use the 15-year schedule in this example.15-year$62,000
Shared walkway interestThe allocated detached site walks serve the common grounds and use the 15-year schedule in this example.15-year$18,000
Exterior and frame shareAllocated masonry and structural framing enclose the suite and use the 39-year building schedule in this example.39-year$240,000
Suite floor slabThe slab and composite floor deck support the fourth floor and use the 39-year building schedule in this example.39-year$175,000
Windows and entry doorsFixed windows and passage doors are building elements and use the 39-year building schedule in this example.39-year$130,000
Shared arrival coreAllocated elevator and stair interests provide permanent access and use the 39-year building schedule in this example.39-year$120,000
Suite comfort HVACFixed ducts and fan coils condition the occupied suite and use the 39-year building schedule in this example.39-year$120,000
Fixed office partitionsPermanent walls separate the conference room and private offices and use the 39-year building schedule in this example.39-year$120,000
General power and lightingGeneral circuits and lighting serve ordinary office use and use the 39-year building schedule in this example.39-year$105,000
Shared roof interestThe allocated roof membrane and parapets protect the host building and use the 39-year building schedule in this example.39-year$79,000
General plumbingDomestic supply and waste branches serve ordinary building fixtures and use the 39-year building schedule in this example.39-year$75,000
Restrooms and fixturesPlumbed fixtures and restroom partitions are permanently installed and use the 39-year building schedule in this example.39-year$70,000
Entry and corridor tileTile and bonded hallway finishes remain with the building and use the 39-year building schedule in this example.39-year$60,000
Staff kitchen cabinetryFixed staff kitchen cabinets and sink serve the suite and use the 39-year building schedule in this example.39-year$50,000

Sources